Catastrophic Fire Loss - 60,000 SF Fully Restored in 13 Months
Complete reconstruction delivered with full code compliance, upgraded building systems, and modernized infrastructure — returning the asset to operational status on an accelerated schedule.
46-Story Granite High-Rise Façade Assessment and repair
Collaborated directly with project engineers to perform a comprehensive evaluation of a 46-story granite façade system, including detailed analysis of granite panel integrity, sealant performance, and panel attachment conditions. The assessment identified deficiencies, long-term deterioration risks, and required corrective measures.
Working alongside the engineering team, developed a detailed technical work specification and phased execution strategy, establishing a structured three-year restoration program designed to maintain safety, protect the building envelope, and support long-term asset performance.
Large-Scale Multifamily Reconstruction – 550+ Units | 60 Acres
Directed comprehensive redevelopment of a 550+ unit residential property encompassing approximately 60 acres, managing all phases from structural recovery and infrastructure upgrades to final tenant-ready delivery. Services included structural repair, full mechanical, electrical, and plumbing modernization, envelope stabilization, code-driven improvements, construction management, and coordinated turnover for leasing operations. Successfully delivered a stabilized, revenue-generating asset following complete project execution.
Large-Scale Property Conversion & Expansion
Managed a major property conversion designed to increase unit density by doubling the door count from 144 units. The project included full installation of new mechanical, electrical, and plumbing (MEP) systems, along with comprehensive upgrades throughout the entire complex. Scope encompassed structural modifications, infrastructure improvements, system modernization, and full-site renovation to support expanded occupancy and long-term operational performance.
If you want, I can also give you a more impressive “developer / institutional” version — the style large construction firms use where the project instantly sounds high-value and sophisticated.
Large-Scale Mechanical System Modernization
Executed a major mechanical redesign and system upgrade within a 100,000-square-foot healthcare facility, including complete HVAC and hot water distribution modernization. Scope involved design coordination, installation of a new chiller system, and conversion from an aging steam system to high-efficiency boiler infrastructure. The project significantly improved operational performance, energy efficiency, and system reliability, resulting in utility savings exceeding $30,000 per month for the client.